Scamp gets open body surgery!

The surgery continues.
Wheelhouse all cut out.
208709749.jpg

Got everything trimmed out to make enough room for the new tubs.
208709744.jpg

Since i had to cut all the way into the frame to make enough room i have to weld the frame and floor back together again to make everything solid again.
I have the spring relocation kit ordered so i wanna put them in before i put the tubs in because it's gonna be alot easier to do with everything cut out of the way.
The wood blocks in the pic. are for support,with all of the supports and qtrs. cut off i didn't want to take a chance and have things sag.