Your going to have a moment of Awesomeness ones you get all the pipes welded and everything mounted and are able to step back and just look at how cool it is.
I visited Brian today "the machinist-ou812, IMM Engines" and picked up my upgraded heads ready for the Solid Roller Cam. The Scat FORGED crank came in also. The pistons should be here in about 3 weeks or so. They are Forged Diamonds with tool steel pins and we will be using a GFX ringset. He already has the 4340 H Beam Rods in his possession that are made by FALCON and have arp 7/16 hardware in them. So we are waiting for the pistons and then the block will get machined for everything.