3 Generation Project
A little more progress this past weekend. Started installing my first four link. It was pretty intimidating. Measure, measure, measure...spot weld, measure, cuss, cut off spot welds, measure...third time was the charm. As far as I can tell, measuring it from about six different ways, its centered and square. I need to put the coil overs in this week. Then disassemble and finish weld. Then I will start hunting for a powder coater. The brakes should also be here this week. She will be sitting on the ground very soon.
The first photo is the only real modification i had to make to the Control Freak kit. The bracket is made to sit on the flat and radius of the housing. This housing's bracing came out further so i just cut the radius off.
The last photo gets me excited.