Tubular Lower Control Arm Thread
Started building the jigs last night. I machined a plastic bushing on the lathe just to mock up the pivot pin on the factory LCA's. This position will get welded solid so every one will be exactly the same from the Lower ball joint to the pivot plane. I welded on a factory upper ball joint which has the same taper and size as the lower, just for ease of attaching it. I will still need to weld the attachments for the drag links and get that angle right as well as the factory sway bar position. I will be busy the next couple of days.