project redfish 1

finally got the rear in the car, installed brake hose, parking brake cables, driveshaft, torqued everything to spec. here are some progress pics.

tomorrow, i will plumb the front portion of the brake line with a prop valve and fuel with a comression to an fitting. i then have to wait for the rear axles lines.

DSC00350 (Small).JPG

DSC00351 (Small).JPG

DSC00362 (Small).JPG

DSC00363 (Small).JPG

DSC00364 (Small).JPG