200R4 update
Last night we drilled the hole and installed the shifter cable. The transmission is so high in the tunnel we drilled a hole at an angle through the upper crossmember to clear the transmission. We quickly realized we had to lower the transmission to get it run properly. It is now in and connected and it shifts properly. We ran the wires for the neutral safety switch and back up lights. Life is getting good.
We also decided to slap in the new back halves of the Calvert Racing mono leafs. The front end was kind of high still even with the motor in. With the new 2" higher leafs it brought it just a tad higher than the front. A nice high stance. I don't think I will have to adjust the torsion bars at all. I am very happy with the height.
We talked about all the things we have left to do. There is not much left. It might be running this weekend with any luck.