This is our first roll cage install, so the rest of the tubes should go in a lot faster. I didn't realize how much time it takes to perfect the little 2 x 2 .125 subframe outriggers going from the frame to the rocker. Hopefully we'll get a lot more done this weekend. Once this damn cage is in, I'll be able to get this thing back on the ground and mock up the engine and trans.