Show Us Pictures of 2nd Generation Barracudas
How my fish became a drag car...
So the 3nd phase of the build goes like this:
Lighten the car up as much as possible - Replace glass with plexiglass, remove everything not needed
Put in the electrical systems
Put in fuel system
Install the interior components
Car is done and runs
Take the car to the track to try it out
Make a few partial runs to set suspension and engine
First all out quarter mile run - 10.393 et at 128.18 mph
Ma Snart
4th phase to follow soon...