"1970 Pro Touring Dart Build"

:D
Take your pick!

Bunch of stuff that needs to be taken care of.

Mount steering column and steering linkage to the rack.
Final fitting of the glove box.
Seat brackets.
Weld up a few spots.
Finish fuel door and fill tube.
Weld up holes in the firewall and inner fender.
Weld battery tray in the trunk.
Figure out how I'm going to route the battery lines.
Weld tabs onto the K member for the sway bar.
prep parts for powder coating.
Remove the rear end and test fit the disc brake kit.
Install new slip yolk onto drive shaft.
Remove wiper pivots and rebuild them.
Mount the rear and front spoilers.
Fix the grill tabs.

I know there is more, just don't have the list in front of me.

Heck..... according to the list, I've been there and done that already for most of it, I don't feel like such a slacker all of a sudden. Of course I've been working on this since September 2010.