i have others ahead of it. i like to do first. i am going to fix the engine bay. paint it. install engine and trans. fix were they where going to tube the car. their is a cross over frame rail installed. i am going to cut that out and fix the the floor. install the interior and drive it the way it is for now. if i do not do at least this the car will end up sitting. i want get it running as fast as possible.
its been tough for me. i injured myself and its been a long process. i have to have another operation in October. what sucks is i have 3 cars that are 95 to 99% ready for the road and this bump in the road has slowed everything down.