Blue Sky Hemi Duster Build

Ok, it's been a while since I've checked in. I have been making some progress, however. I've cleaned up the engine bay and frame rails of the Duster and that preparation has led me to successfully test fit the RMS K-frame. That thing bolted up perfectly.



With that done, I mated the 6.1 to the K-frame for initial fitting of the whole assembly. I realize I'll have to work on the transmission tunnel to make room for the NAG1. Once I figure out exactly what has to be done it will be guns blazing until the K-frame/engine/trans is installed.



Actually getting all that installed seems like a big milestone to me. Things are getting exciting in Baby Blue Duster land.

As usual, feel free to check out my duster project blog if you're interested.