Will this get me a prepped block?

All the parts have been bought, im speaking of machine work. Rods wont be getting reconditioned as they are new rods. Up in the air on the align bore, I will have it checked and done if something is out of wack.

If you decide to align hone then I would consider using studs for the mains.

Just a thought...
Mike