Arizona Swinger

Well......bit the bullet and ordered those 3 Holley two barrel carburetors for the six pack set up! Now the only big ticket items left to be ordered are the radiator and shroud and paying for the seats being upholstered and the headliner being installed. Also waiting for the back ordered gas tank and a few other misc. parts.

Managed to get the quarter window regulators installed this PM! Sure am glad that I marked all of the bolt and guide locations before I removed them! The first one had to be taken apart several times to get everything in its' proper location. Second one assembled in less than 15 minutes! The only problem I had was with the aftermarket white roller that goes into the rear vertical channel. Diameter seems to be too big to slide into the channel. Had to use some 'creative filing' to get it to the proper diameter. Other than that and the need to generously lube all of the tracks when I have some daylight, everything is ready for the quarter glasses to be installed to their housings.

My mind still keeps going back to the fact that this car was less than 3,000.00 dollars new! I'll be lucky if this rebuild doesn't add another 0 to that figure! Even so, I sure am enjoying this! Ben.