Another 1st time port job thread

On the exh port leave the floor alone It's to low from the factory.

Also blend down the machining ridge from the top cut in to the chamber. One of the keys in getting good flow is a 3 angle valve job and decent back cut valves (usually stainless).

And blend the bottom cut(of the 3 angle valve job) into the bowl.