Cinnamon 75 Duster \

Thanksgiving – first week of Dec 2012
And I was thankful for more warm weather. Finished the spare well, replaced the gas tank, and re-did the entire brake system. I had bought the lines from Inline a year earlier. Replaced all hydraulics except the prop valve. I got a second one on ebay and made one good one out of them. I replace the rotors , which looked good, but were under size. I took everything apart on the rear. Shoes had full pads on them. Cleaned up, painted and reassembled with new springs. I did need an intermediate cable which I found OEM on ebay. I am going to need to do something to the calipers and master cyl in the spring. I thought they were supposed to come with a coating on them, but they are already rusting..
The original tank had a big dent in it, so found a nice replacement from salvage. It came with good straps and bolts. I cleaned it up and painted it. Tried cold galv first, but did not like the look. Repainted it with Krylon stainless steel, and topcoated with clear Rustoleum Engine paint. I replaced the tank pad with rubber cut to original shape


2012-11-17 16_01_18 (2) (640x480).jpg

DSCF0467 (640x480).jpg

1354906783884 (214x160).jpg

DSCF0487 (640x480).jpg

DSCF0473 (640x480).jpg