The instrument panel is one of the next items on the list
Not much more left to do other than paint, transmission, interior, instrument panel, suspension (already about 50% done), fix the differential leak, the exhaust system and the engine bay wiring have 95% complete wiring harness so that shouldn't take long.
By the way the seats are from a Mitsubishi eclipse (yeah I know boo, but hey they work and are very comfortable).