Will GM 200r4 work with factory floor shift location?

Ok now it's really getting close. I'll stop on it for now and work on something else. I finish welded the triangular bracket and cut off that one piece of the orange part that was sticking up. Slotted the holes still need to hit them with a rat tale. I also made a gusset and welded it in place to ensure that the TV cable bracket doesn't flex back and forth. I'll clean it up some more later and sand blast it and paint.

Treblig