3 Generation Project
Haven't posted for awhile. Finally had some time to get to it. We got the cage welded in with removable door bar. I'll use that only at the track. Took a lot more time than I thought. Measuring, notching, fitting, welding. Being 6' 5" and having to contort yourself in all kinds of crazy positions to be able to reach all the areas that need to be welded wore my *** out. On to the package tray next.