**73 Scamp Mini Pro-Street Engine Swap**
I just landed all of the wiring to the O2 Sensor, T-Brake, Line Lock & Launch Retard. The floor shift provision is in and painted. When the seat was in the car I tacked the sliding tracks so it won't move anymore and when I took it out I buzzed 2 - 1" welds with the mig on both tracks in a spot where they can be ground off just in case. I started putting the carpet in and have the back half almost all cut in. The front half I am waiting for the paint to dry on the shifter provision before I install it. Tomorrow all of the carpet should be in along with most of the seat belts. The window guy should be here tomorrow or Thursday if all goes well.