71 Duster 360 (new project)
So I spend most of this morning and afternoon on my back...with a couple of plumb bobs...steel tape..steel ruler...digital level......all the high tech stuff needed to line up the rear...
got the moser fab welded to the ladder bars....was working on the lower shock mounts.....had to do some grinding for those brackets to get around the back brace...even though these brackets are make for a back brace.....the moser brace get wider as it get closer to the pumpkin...
then my measurements were not adding up for where the lower mounts were suppose to be...so I gave up for the day...beside it was 104 degrees...and the swamp cooler was not getting it done...