What Are You Doing To/With Your Car Today?

http://www.forabodiesonly.com/mopar/attachment.php?attachmentid=1714736230&stc=1&d=1405319392

This past weekend I got a new blinker switch installed, (still need to make the conduit under the column that hides the wires) new lower steering column cover, chrome gas pedal bezel to match the brake pedal. A few weekends ago was a new dimmer switch, ignition switch with bezel AND matching Mopar logo keys, brake light switch, before that it was park brake handle assembly, ash tray assembly etc etc. The next order of parts will be new steering wheel, turn signal arm, seat covers etc etc.
This comming weekend I will install two more guages, fuel level and volt meter and hopefully try out this new hydro dipping process on the tinwork in the dash and the door panels to get them all to match, thinking about the carbon fiber look. The fun part of new wire harness from headlights to tail lights is soon to follow!!!