**73 Scamp Mini Pro-Street Engine Swap**
I finally had time to take the housing out and strip it down. The Housing is at the Powder Coater along with the Diagonal bar. Both are being done in Satin Black. 3 to 5 working days is what I was told for lead time.
Starting tomorrow I will be starting the patch painting etc under the car, then doing the fuel and brake lines after that & re installing the exhaust so the bottom of the car is all done. At that point I can concentrate on getting the trunk buttoned up.