Passon 5-speed

I talked to Jamie before Christmas and he told me the situation was a bad news/good news ordeal. Because of demand he has realized he can't produce at the rate of demand and will have to modify his production system. The bad news is that during the production modification output of units will be very slow, but the good news is that once he has the new production underway he will be able to get units out a lot faster and much higher volume. I'm in the low 180s on the list and he says I'm realistically looking at around September for delivery.