Thanks, I'm shooting to be done by mid-summer if all goes well and the cashflow is steady. Might be sooner since I'm going for a promotion/new job in the near future.
Getting impatient with the crappy weather so I decided to set-up a painting table in my room for the mean time. I have a mask, 2 ceiling fans, a tower fan and two windows to crack when I'm ready to shoot so it shouldn't be a problem. Did some prep work on the plastic trim I brought to my house to smooth out the surface before painting it black. Waiting to hear back from the machine shop if the heads I pulled are good or not.