My69ValiantProject

Been awhile got a few things done in the past 2 weeks. I have to thank Steve Kiss aka oldmanmopar for all the work he did for me. While recovering from knee surgery... We put SS springs and all new bushings and rear shackles. All new stainless steel brake lines, updated master cylinder newer style 2 bolt with adapter. Total rebuild of the front end. Upper and lower balljoints,A arm bushings,inner and outter tie rods,strut rod bushings. Lower control arms with tabs welded reinforce plates on bottoms. New Hellwig swaybar installed. Put calipers on back side of rotors for clearance. A straightened the right side frame rail between bumper and K member....Pictures to follow...