DANGEROUS PRODUCT = Moog Ball Joints

There are procedures for setting up running parts. One of which is to test the pull-off/pull-out force to remove the ball from the socket after installed. They should test at least 3-5 pieces for each set-up, and then run periodic checks throughout production.

They are obviously not performing these checks either to cut costs or the operator is being lazy and management not keeping on it.