I notched the shock tower, recontoured and repositioned the shock mount (behind the sheet metal), and moved the upper shock mount hole 3/4" outboard. It's about a 12 hour job to do it right. I also move the steering box outboard 1" to allow for additional space.
I'm glad you are getting some value from these pics.
I'll post more tonight. Getting ready to run to Auburn Hills, MI