Spent all day on the Barracuda yesterday. Got the GV in and set up, installed the starter and connected it, wrapped the cableing that runs past left exhaust with heat protection, installed battery kill switch and wired negative cables to motor and ground buss.
Today. install console shifting mechanisim then install the front carpet. If I have time, I will get the console in and get the GV controller that mounts in the console connected and finalized. When that is done, install the intake, power steering and alternator on the engine.
All said, pretty hard on an old man body----------serious pain in the muscles and joints.
But a 1967 Barracuda notch is not going to build itself----------------:rock: