Nearly done with all the stuff on the GTS. The only things left are mounting the new rear tires, installing the rear shackles and front alignment. Hopefully I will have it back by the weekend...early next week at the latest (waiting on shackles to arrive).
Here's the complete list of what I'm doing...
Power front disc brake conversion kit
Cragar 1/2” front wheel spacers
New rear brake shoes, hardware and drums
Flush and replace brake fluid
Moroso 7/16” RH wheels studs and lug nuts-all 4 wheels
New tie-rod end boots, inner and outer and lube
New 225/60/14 BF Goodrich T/A tires on rear
Adjustable Mr. Gasket rear spring shackles with 2” lift (1” at rear axle)
Front wheel alignment
Repair and adjust emergency brake cable
Replace water pump heater hose barb and hose
Install new HD battery-body ground strap