does that rule include the fact if you use a scatter shield, which I'm using? Mine might go to the track just to test for fun, maybe. Thanks for the info on the rules.
Fuel lines (except steel-
braided lines) in the flywheel/bellhousing area must be enclosed in a 16-
inch length of steel tubing, 1/8-inch minimum wall thickness, securely
mounted as a protection against fuel-line rupture.