Wife and I got a little more done on the 2nd floor "Man Cave" in my shop today.
I rented an drywall lift and we got all the ceiling sheeting installed. I still need to prime the ceiling sheeting on the right side. I realized after I had it installed that it would be easier to paint it first. I am using Kilz2 to primer the OSB. Then I will caulk all the screw heads and seams, then two coats of Semi Gloss like the rest of the shop.
This room is a place for all of my Deer hunting thropies, car memorabilia, and will also be my Ham Radio "Shack".
I am goig to start on the electrical and phone and data wiring tomorrow.
Herb
View attachment 1714934363