Coolant recovery tank on fender

I also installed 1/4-20" riv nuts for the mounting bracket. I wet installed these with JB weld to help seal them to the framerail , and help lock them in place. I made my own riv nut puller out of some hardware i got from lowes, and a small needle bearing plate, and drilled and moved my horn over 1/4" to the right

20161111_144731.jpg

20161111_151421.jpg

20161111_153144.jpg

20161111_163850.jpg

20161111_163921.jpg

20161111_163903.jpg