T for 2

Well another weekend has come and gone. Here are the progress photos.IMG_20161230_191116865-2672x1503.jpg
We replaced the straight oiling fittings with 90 degree fittings. We also installed the oil cooler.

IMG_20161231_174047036-2672x1503.jpg We removed the master cylinder, drilled the lower holes and installed button head bolts. We also connected the lines to the proportioning valve.
IMG_20161230_191151314-2672x1503.jpg We installed the fuel cell in the bed.
IMG_20161230_191204081-2672x1503.jpg