T for 2
Well another weekend has come and gone. Here are the progress photos.
We replaced the straight oiling fittings with 90 degree fittings. We also installed the oil cooler.
We removed the master cylinder, drilled the lower holes and installed button head bolts. We also connected the lines to the proportioning valve.
We installed the fuel cell in the bed.