Cheepy Three-Sixty build

Installed the crank and thrust check showed .004"-.005" fore and aft. Then I was able to install #1 rod/piston assembly and check deck height. It actually came in -.010" below deck. I attribute this to the comp height actually measuring 1.634" instead of Sealed Power's spec of 1.637" and I'm sure the stroke is not exactly 3.580" after being ground 20/20. This is a pretty good example how tolerance stack adds up fast. After this weekend the short block

thrustcheck.jpg