65 Barracuda w/500ci RB, Stage VI Max Wedge Port Heads, 6-speed, and 5.38 Dana
It took 1.5 months to get a new blade. Everywhere I contacted said they were on backorder from the manufacturer. I was traveling a lot of that time anyway, but still prevented me from the progress I wanted on this and header fabrication as well.
Fuel cell frame complete. Just need to prep the frame rails and get it welded to them.