Project Crusty Biscuit (65 Plymouth Valiant)

The past few days I’ve spent working on the Valiant have been quite tedious and I was too focused to take a lot of pics. I HAD to make sure that these a-pillars were perfect!
2B96A997-3D81-46DA-A2BB-D6EF930C5C82.jpeg
419AEEB6-9C6B-41BC-80E1-D59B58CDB99A.jpeg

I re-installed the doors before fitting the new pillars. It was a pain with my crappy hinges... I ended up keeping the hinge bolts loose, lined up the door gaps perfectly, then using clamps in the top of the door and the rain gutter to hold them in the correct position.