Father, Son, and Grand Father project. 1963 Valiant

VERY productive day today!!!

As stated previously, upon completion of Bearing replacement we heard a "tink". We decided to pull all the main and rod caps and double check for peace of mind.

Everything checked out good. When completed I showed Jason how to pry the crank back and forth to set the thrust Bearing in place, and than checked thrust. It was well within spec at .0040.



IMG_3476.JPG IMG_3477.JPG

Than we discovered a burr on the pickup tube threads and cleaned it up and throughly cleaned up the pump and installed and measured pickup to pan clerance.


IMG_3478.JPG

Than we lubed up and installed the camshaft and degreed it verifying lift and intake centerline. We installed it 4 degrees advanced with the crank sprocket. Intake centerline on the cam card is listed at 108 degrees.

The camshaft degreed in at 100.5. Talking with Rustyratrod about our findings.


IMG_3479.JPG


Overall it was a very productive day. Tomorrow we are going to start assembling the transmission.

Thanks for reading. Eric and Jason.