SmallBlock engine swap on a Mopar A-body with headers.... Never Again!

When I put Doug's on my duster, we spent 4 hours trying to get them in on driver's side. THEN, we discovered that the last pipe was supposed to be removed from the collector BEFORE installing the front three pipes. After the front 3 bolted in, only then does pipe 4 go in around the torsion bar and back in to the collector.. Took 15 min..
No, it took 4hrs and 15 minutes. Lol