SS Springs on 75 Duster
Some more things done the last couple of days....
Finished the welding of the frame connectors.......mounted fuel pump...ran fuel line...mounted the fuel regulator in the engine bay....got the line lock plumbed up and bolted down....Now I can bleed the brakes...got a few more things to do...then I am going to drop the motor and trans in ....was not going to do it for awhile but gotta push the schedule up....
I need that bay in the garage for the 71 Duster....the Dana has not shipped yet but should be soon..and I need the bay with the 2 post lift in it.....
So this 75 duster gets pushed out of the way .....but goal is to have it running by Sept ....along as nothing breaks tomorrow at the races....LOL