SS Springs on 75 Duster
The heat and now the humidity from the monsoons are killing me..
Got most of the wiring now completed....need small things like line lock on shifter wired....tach.....and couple of wires for the taillights to be terminated...
oil pressure gauge is now hooked up...found that 1/8 compression fitting that fell on the floor last week..
finished plumbing the trans cooler...still gotta swap out the transmission cross member...
Got the plugs in the engine...and plug wires installed...not sure if I like these wires...seem to be too long,,,,
Need to blow out the new fuel lines to make sure no crap is in them...put a couple gallons of gas and see if I got any leaks before we try to start it...first time I used twist lock fittings...