What I mean is that you now have two lines, one from alternator to the battery with a 14 fa fusible link, one to through the bulk head to the fuse block, then back to the starter relay via a 16 fa fusible link. Thus you're not having the full flow of the Alternator going through the bulk head, essentially splitting the load?