68 twin turbo dart project.

Ok I finally caught up on stuff and I am ready to post more pictures of the build here. From this point till it ran was about 6 weeks. My buddy and I worked a few days a week at 4-5 hours a day after work. Then about 2 weeks before the deadline to leave for drag week I spent 20 hours a day everyday to get it done and my buddy came after work everyday. We were exhausted by the end. This is the front suspension install, and brake lines and master cylinder.

BE8B8B5D-CE08-4924-8B3F-AEC3A4D1C5EB_zps4gk5kmv3.jpg
IMG_0131_zpsnvtxerir.jpg
IMG_0132_zps5ag1fqwn.jpg

Also we had to paint the chassis, which was a pain in the rear with a painted car. It took me 10 hours to mask the darn thing and then painting the chassis with single stage PPG black took another 6 hours. What a long day that was. I don't really have any pictures of that because my phone took a swim and I lost a bunch of photos.

IMG_0139_zpsb50xrjgt.jpgIMG_0134_zpsso3bnnyn.jpgIMG_0173_zpstknjlx3e.jpgIMG_0173_zpstknjlx3e.jpg

The front and rear suspension went in really quick and it was the kind of momentum that we needed.