Stop in for a cup of coffee

Appts booked into the 26’th,guy that wants body panels replaced added lower box side repairs and pull wheelwell flares. Its gonna take a day to get all the adhesive off.that alone ballooned from 4 days to maybe 8. If im lucky. Have to leave the paint intact.
Two different guys want work on their one-tons.