65 Barracuda w/500ci RB, Stage VI Max Wedge Port Heads, 6-speed, and 5.38 Dana

Split the floor to 7" above the firewall seam, beat the floor up, attached the scattershield, put a jack underneath the scattershield, and jacked up until the engine was slightly nose down. This helped to ensure I have the necessary room for the T56 when I'm ready for test fitting.

My next task is cutting the crossmember out for fabrication of the new one.

20181228_111619.jpg

20190106_130757.jpg