Condensation issue

Any slab poured on the ground should have a vapor barrier under it before the concrete is poured.

If insulating too, put it on top of the plastic barrier.

Concrete is porous so ground moisture can travel up through it if their is no vapor barrier in place.

Trying to deal with it afterwards can be a pain.