If you know for sure where you want the lift to be, then they can dig deeper pockets in just those spots when they lay the floor. Then you won’t need to cut and repour later. Sometime concrete floor guys think too linearly and it’s all to be poured at the same depth...but there is nothing that requires concrete to be the same thickness everywhere. Hell, they can even pour deeper blocks in those spots and lay the rest of the floor afterward.
I have seen that done. Big blocks poured and cured. Then floor poured over the blocks.