Finished porting the last head this morning. about 18 hours of porting, smoothing, and on the exhaust side buffing into this pair of heads. Now I move on to the valve job..... which will include buying exhaust valves and springs.
This picture at the bottom shows that I removed the valve cover bolt bumps. Head is upside down.