Stop in for a cup of coffee
Long evening. Right side of truck roughed in,left inner rocker is in and rocker is prepped to weld in next visit. I figure 7 evenings and it will be ready for filler.
14 hours 6 patch panels.
Father Son project im helping with the hard parts. Im glad im doing it at their place, would be a hassle to do it here.