1972 Duster Build with my Daughter

Now install the 2/3 clip for behind the upper bearing

DSC_0060.jpg

DSC_0061.jpg

slide on the cover to keep the roll pin from every coming out.

DSC_0062.jpg

The final casting goes on next.

DSC_0063.jpg

The indicator was dipped in my Coronet Orange earlier in the day so it was installed and aligned.

DSC_0064.jpg

Now the upper bearing goes in. the original was in perfect condition after cleaning it with Acetone and repacking.

DSC_0065.jpg

After tapping it in install the snap ring and use to seat it the rest of the way. I use a socket to drive it home.

DSC_0066.jpg

When the bearing is all the way in the snap ring ends will come together as it falls in the groove.
DSC_0067.jpg

Install the hazard light

DSC_0068.jpg

Work the new turn signal harness down the column.

DSC_0069.jpg