Stop in for a cup of coffee
Morning.
Staying below freezing today.
Hoping to get patch panels in floor done today.
3 on one side and 2 or less on the other side. The right side is worse.
There’s one part in trans tunnel that looks like it was never welded. Will pull it together and do a couple plug welds.
Im tempted to drag out my 30 year old 110 volt welder and resurrect it.